Eastern Correctional InstitutionCentral Production Kitchen Renovation
and Expansion Westover, Maryland As prime consultant, Kibart
designed the renovation and expansion of the Eastern Correctional Institution
Central Production Kitchen to eliminate existing Health Code and Hazard Analysis
Critical Control Point violations and provide the facility with extended capacity
to prepare over 9,000 meals per day. Design Features:
- Continuous uninterrupted food processing operation throughout entire renovation
and expansion
- Extended capacity to prepare meals for a new 420-bed minimum
security facility
- Cook/Chill Technology enhanced the increased meal production
capacity
- Corrected the kitchen hood exhaust system and various other
building deficiencies
- Installed new kitchen equipment and refurbished
existing kitchen equipment and systems
- Expansion of 5kv unit substation
capacity
- Fire alarm system
- Electrical distribution system employing
prioritized load shedding for emergency power operation
- Central ice builder
and storage system for food process chillers
Website: www.dpscs.state.md.us |
Design of a 1,875 S.F. addition provided: - Increased food
storage and sequencing capacity
- Increased bakery capacity
- Recipe
kitchen area
- Toilet room and storage areas
- Separate clean and
dirty kitchen function
| |