Eastern Correctional Institution
Central
Production Kitchen Renovation and Expansion
Westover, Maryland
As prime consultant, Kibart designed
the renovation and expansion of the Eastern Correctional
Institution Central Production
Kitchen to eliminate existing Health Code and Hazard Analysis
Critical Control Point violations and provide the facility
with extended capacity to prepare over 9,000 meals per
day.
Design Features:
- Continuous uninterrupted
food processing operation throughout entire renovation and
expansion
- Extended capacity to prepare meals for a new 420-bed
minimum security facility
- Cook/Chill Technology enhanced the increased meal production
capacity
- Corrected the kitchen hood exhaust system and various
other building deficiencies
- Installed new kitchen equipment and refurbished existing
kitchen equipment and systems
- Expansion of 5kv unit substation capacity
- Fire alarm system
- Electrical distribution system employing prioritized
load shedding for emergency power operation
- Central ice builder and storage system for food process
chillers
Website: www.dpscs.state.md.us
|
Design of a 1,875 S.F. addition provided:
- Increased food storage and sequencing capacity
- Increased bakery capacity
- Recipe kitchen area
- Toilet room and storage areas
- Separate clean and dirty kitchen function
|
|